Safety
Product
Mechanical
Information
Information
Installation
•
See Figure 4-15 for details of installing the grounded metal panel on
size 0 drives.
•
See Figure 4-16 and Figure 4-17 for details on installing the
grounding clamp.
•
See Figure 4-18 and Figure 4-19 for details on installing the
grounding bracket.
Figure 4-15 Use of the EMC bracket on size 0
Figure 4-16 Installation of grounding clamp (size 1 and 2)
Figure 4-17 Installation of grounding clamp (size 3)
82
Electrical
Getting
Basic
installation
Started
parameters
www.controltechniques.com
Running
SMARTCARD
Optimization
the motor
operation
Figure 4-18 Installation of grounding bracket (size 0)
Figure 4-19 Installation of grounding bracket (sizes 1 to 6)
Loosen the ground connection nuts and slide the grounding bracket in
the direction shown. Once in place, re-tighten the ground connection
nuts.
On size 1 and 2, the grounding bracket is secured using the
power ground terminal of the drive. Ensure that the supply
ground connection is secure after installing / removing the
grounding bracket. Failure to do so will result in the drive not
WARNING
being grounded.
A faston tab is located on the grounding bracket for the purpose of
connecting the drive 0V to ground should the user require to do so.
When a size 4 or 5 is through-panel mounted, the grounding link bracket
must be folded upwards. A screw can be used to secure the bracket or it
can be located under the mounting bracket to ensure that a ground
connection is made. This is required to provide a grounding point for the
grounding bracket as shown in Figure 4-20.
Onboard
Advanced
Technical
Diagnostics
PLC
parameters
Data
Unidrive SP User Guide
Issue Number: 13
UL Listing
Information