Power On The Server (Power Button) - Oracle SPARC T5-8 Service Manual

Hide thumbs Also See for SPARC T5-8:
Table of Contents

Advertisement

Power On the Server (Power Button)

If you are local to the server, you can use the Power button to start the system. However, the
start up process depends on the last power state of the system and on Oracle ILOM policy
settings. After pressing the Power button, you will need to check the system to ensure that it is
running.
Connect a terminal device to the server, if necessary.
1.
2.
Momentarily press and release the Power button on the front panel.
See
"Front Panel Controls and LEDs" on page 31
3.
Ensure that the system has been started.
show /System power_state
->
If the system is running, go to the verification task for the component.
If the system is not running, go to
Start the system.
4.
start /System
->
5.
Determine your next step.
If you are servicing a component, return to the procedure for that component.
If you are upgrading the server, return to
Related Information
"Verify the Battery" on page 126
"Verify the DIMM" on page 80
"Verify the Processor Module" on page 70
"Verify the Rear I/O Module" on page 178
"Verify the Service Processor Card" on page 114
"Verify the System Configuration PROM" on page 120
"Server Upgrade Process" on page 59
for the location of the Power button.
Step
3.
"Server Upgrade Process" on page
Returning the Server to Operation
Power On the Server (Power Button)
59.
193

Advertisement

Table of Contents
loading

Table of Contents