Oracle SPARC T5-8 Service Manual page 96

Hide thumbs Also See for SPARC T5-8:
Table of Contents

Advertisement

Install the Main Module
4.
Press the levers back together toward the center of the module, and then press
the levers firmly against the module to fully seat the module back into the server.
The levers should click into place when the module is fully seated in the server.
5.
Determine your next step:
If you replaced an internal component, return to the procedure for that
a.   
component.
b.   
If you replaced the entire main module, see
Module" on page
96
SPARC T5-8 Server Service Manual • November 2015
"Verify the Battery" on page 126
"Verify the Front I/O Assembly" on page 131
"Verify the Service Processor Card" on page
"Verify the Storage Backplane" on page 107
"Verify the System Configuration PROM" on page 120
97.
114.
"Verify the Main

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPARC T5-8 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents