Verify The Rear Chassis Subassembly - Oracle SPARC T5-8 Service Manual

Hide thumbs Also See for SPARC T5-8:
Table of Contents

Advertisement

Verify the Rear Chassis Subassembly

Components
Power supplies
Main module
Processor modules (bottom to top)
Cables
8.
Power on the server.
See
"Returning the Server to
Verify the installation.
9.
See
"Verify the Rear Chassis Subassembly" on page
Related Information
"Remove the Rear Chassis Subassembly" on page 182
"Verify the Rear Chassis Subassembly" on page 188
Verify the Rear Chassis Subassembly
Ensure that you have completed the following:
1.
Applied power to the server.
See
Started the system.
See
Log in to Oracle ILOM.
2.
See
"Log In to Oracle ILOM (Service)" on page
3.
Start the faultmgmt shell.
start SP/faultmgmt/shell
->
Are you sure you want to start the faultmgmt shell (y/n)?
faultmgmtsp>
4.
Use the fmadm faulty command to determine if the server is operating normally.
If a fault was detected, see
If no fault was detected, the rear chassis subassembly was installed successfully.
188
SPARC T5-8 Server Service Manual • November 2015
Operation".
"Connect the Power Cords" on page
"Power On the Server (Oracle ILOM)" on page
"Diagnostics Process" on page
Links
"Install a Power Supply" on page 137
"Install the Main Module" on page 95
"Install a Processor Module or Processor Filler
Module" on page 67
According to their lables
188.
191.
192.
28.
y
25.

Advertisement

Table of Contents
loading

Table of Contents