Engine Installation - Suzuki GSX1400 Service Manual

Hide thumbs Also See for GSX1400:
Table of Contents

Advertisement

3-8 ENGINE

ENGINE INSTALLATION

Install the engine in the reverse order of engine removal.
Pay attention to the following points:
NOTE:
Hang the drive chain on the driveshaft when installing the engine.
ENGINE MOUNT
• Install the engine and tighten the engine mounting bolts and
nuts.
99000-32050: THREAD LOCK "1342"
BOLT LENGTH
ITEM mm
in
1
35
1.4
2
25
0.98
3
14
0.55
4
60
2.4
5
50
2.0
6
14
0.55
7
140
5.5
8
155
6.1
N . m
ITEM
123
50
45
55
6
23
7
88
8
85
www.GSX1400FE.com
kgf . m
lb-ft
5.0
37
5.5
41
2.3
17
8.8
65
8.5
63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents