Nortel 1000E Maintenance Manual page 34

Nortel communication server maintenance manual
Hide thumbs Also See for 1000E:
Table of Contents

Advertisement

34 Hardware maintenance tools
The NTDW61 CP PM Call Processor card functions only with the NTDW60
Media Gateway Controller (MGC) card and does not support the Small
System Controller (SSC).
The CP PM has no power (PWR) LED.
The CP PM/MGC architecture has no system utility (Sys Util) card, so the
display usually associated with the Sys Util card is not present.
Figure 5 "NTDW61 CP PM Call Processor" (page 34)
of the CP PM Call Processor card.
Figure 5
NTDW61 CP PM Call Processor
Initialize button
The manual initialize (Init) button associated with the active Call Server starts
the Initialize program. The Initialize program can clear some equipment
faults. It then rebuilds call-dependent data and generates system messages
indicating the status of the system. This process is called an initialization.
Reset button
You can cold restart the processor card with the Reset button. This is
equivalent to a full power start up of the processor card. The System
Loader initiates call processing and starts memory-checking diagnostics.
This process is called a system reload or sysload.
Copyright © 2007, Nortel Networks
.
In a system configured for Campus Redundancy, place the two CP
PM Call Servers in separate MG 1000E cabinets to increase potential
survivability.
CAUTION
SERVICE INTERRUPTION
Call processing is briefly interrupted during an initialization.
Nortel Communication Server 1000
Communication Server 1000E Maintenance
NN43041-700 01.02 Standard
Release 5.0 20 June 2007
shows the faceplate

Advertisement

Table of Contents
loading

Table of Contents