Toshiba e-studio200l Service Handbook page 522

Hide thumbs Also See for e-studio200l:
Table of Contents

Advertisement

[Procedure 2]
Does the bushing attached to the returning roller shaft smoothly move up and down?
l
NO 
YES
Is the spring of the returning roller detached?
YES  Attach the spring.
NO
Is the tension of the stack processing motor drive belt normal?
NO 
YES
Is the returning roller home position sensor (S3) working properly?
NO 
YES
1) Replace the stack delivery motor.
2) Replace the finisher controller PC board.
MJ-1025 (Paddle motor abnormality)
Is the paddle home position sensor (PI2) working properly?
NO 
YES
Is the swing guide home position sensor (PI3) working properly?
NO 
YES
Is the wiring between the finisher controller PC board and paddle motor (M2) correct?
NO 
YES
Try turning the paddle motor counterclockwise by hand. Is there mechanical trapping in the
up/down movement of the swing guide?
YES  Fix the mechanism.
NO
Try replacing the paddle motor. Is the problem corrected?
YES  End.
NO
Replace the finisher controller PC board.
e-STUDIO200L/202L/203L/230/230L/232/233/280/282/283
TROUBLESHOOTING
Apply grease on the cut-out part of the front side frame where the bush-
ing contacts.
Loosen the adjustment screw to adjust its tension.
Replace the sensor.
Replace the sensor.
Replace the sensor.
Correct the wiring.
5 - 68
© 2004 - 2010 TOSHIBA TEC CORPORATION All rights reserved

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents