General Descriptions For Pm Procedure - Toshiba e-studio200l Service Handbook

Hide thumbs Also See for e-studio200l:
Table of Contents

Advertisement

4.2

General Descriptions for PM Procedure

Perform the preventive maintenance in the following timing.
e-STUDIO200L/202L/203L: every 6,400 sheets
e-STUDIO230/230L/232/233:every 74,000 sheets
e-STUDIO280/282/283:
(1)
Preparation
Ask the user about the current conditions of the equipment and note them down.
Before starting maintenance, make some sample copies and store them.
See the replacement record and check the parts to be replaced in the PM support mode (6S-
2) or list printing mode (9S-103).
6S-2
: [6] + [START] + [POWER] ON  [2]  [START]
9S-103 : [9] + [START] + [POWER] ON  [103]  [START]
PM SUPPORT CODE LIST
MM-DD-YY 09:30
UNIT
DRUM
DRUM BLADE
GRID
MAIN CHARGER WIRE
SEPARATION FINGER (DRUM)
Turn OFF the power and make sure to unplug the equipment.
(2)
Perform a preventive maintenance using the following checklist and illustrations. Refer to the
Service Manual if necessary.
(3)
Plug in the equipment after the maintenance has been finished. Then turn ON the power and
make some copies to confirm that the equipment is working properly.
© 2004 - 2010 TOSHIBA TEC CORPORATION All rights reserved
every 90,000 sheets
OUTPUT PAGES
PM OUTPUT PAGE
81813
150000
81813
150000
81813
150000
81813
150000
81813
150000
Fig. 4-5
4 - 7
10/06
DRIVE COUNTS
PM DRIVE COUNTS
119758
220000
119758
220000
119758
220000
119758
220000
119758
220000
e-STUDIO200L/202L/203L/230/230L/232/233/280/282/283
PREVENTIVE MAINTENANCE (PM)
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents