Operational Items In Overhauling - Toshiba e-studio200l Service Handbook

Hide thumbs Also See for e-studio200l:
Table of Contents

Advertisement

4.3

Operational Items in Overhauling

Overhaul each equipment with the following timing.
e-STUDIO200L/202L/203L:
e-STUDIO230/230L/232/233:
e-STUDIO280/282/283:
(1)
Replace all the supplies.
(2)
Check the components in the drive section (gears, pulleys, timing belts, etc.). Replace them with
new ones if they are damaged.
(3)
Check all the adhesives such as tape and Mylar if they are damaged or have become unstuck.
Replace them with new ones if necessary.
(4)
Check the performance of all the switches and sensors. Replace them with new ones if neces-
sary.
(5)
Clean inside the equipment thoroughly.
e-STUDIO200L/202L/203L/230/230L/232/233/280/282/283
PREVENTIVE MAINTENANCE (PM)
When the number of output pages has reached 193,000 or 2.5 years
have passed from the start of use (Whichever is earlier)
When the number of output pages has reached 222,000 or 2.5 years
have passed from the start of use (Whichever is earlier)
When the number of output pages has reached 270,000 or 2.5 years
have passed from the start of use (Whichever is earlier)
4 - 8
10/06
© 2004 - 2010 TOSHIBA TEC CORPORATION All rights reserved

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents