Installing the new hot-plug power supply unit

Ê Install the power supply unit as described in section
power supply unit" on page
6.3.3.4

Concluding steps

Ê Connect the power cord to the new power supply unit and secure it with a
cable tie as described in section
page
55.
Ê Only when replacing a power supply unit in a non-redundant configuration:
"Switching on the server" on page 57
"Performing a fan test after replacing a defective fan" on page 89
Ê
6.3.4

Replacing the power distribution board

Field Replaceable Unit
(FRU)
Tools: Phillips PH2 / (+) No. 2 screw driver
6.3.4.1

Preliminary steps

"Locating the defective server" on page 43
Ê
"Suspending BitLocker functionality" on page 63
Ê
"Shutting down the server" on page 45
Ê
"Disconnecting the server from the mains" on page 46
Ê
"Getting access to the component" on page 47
Ê
RX1330 M1
98.
"Connecting the server to the mains" on
Upgrade and Maintenance Manual
Power supply
"Installing a hot-plug
Hardware: 15 minutes
105