Figure 13: Geometrical Requirements Of Go--To--Waypoint Manoeuvres - Raytheon NautoPilot NP 5100 Operator's Manual

Nautopilot operator unit 102--890 ng001/ng002
Table of Contents

Advertisement

Figure 13: Geometrical Requirements of GO--TO--WAYPOINT Manoeuvres

A) The initial position must be "before" the track and less than 10 nautical miles away.
0
2000
4000
B) The initial heading must be between track course minus 45 and track course plus
135 if starting from the PORT side of the track and between track course minus 135
and track course plus 45 if starting from the STB side of the track.
Edition: September 2014
NautoPilot 5000 Series
11
191
Meters
6000
OPERATION
TO--WPT
10 NM
281
101
4000
2000
29
Track
Track 56
TO--WPT
281
0
AUTOPILOT
101
4002.DOC010102

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nautopilot np 5500Nautopilot np 5300Nautopilot np 5400

Table of Contents