Starting A Loopback Tests - Nortel Modular ICS 6.0 Installer's Manual

Nortel modular ics 6.0 digital system package
Hide thumbs Also See for Modular ICS 6.0:
Table of Contents

Advertisement

530 / Tests

Starting a loopback tests

Start with the display showing Loopback tests:.
8. Press ≠. Show Module: displays.
9. Press '. Cards on KSU displays.
If you want to test cartridges on another module, press
' until the display shows the module.
10. Press ≠. Cd1-KSU displays.
If you want to test the second cartridge on the KSU, press
'
11. Press ≠.
If there is an analog cartridge in the slot or the slot is
empty, the display shows Need digital crd.
12. Press ' until the display shows the test you want
to run: Continuity loopback, Line loopback, Payload
loopback, Card edge loopback.
13. Press START to begin the test. The display shows the test
name followed by running.
14. Press STOP to end the test.
Modular ICS 6.0 Installer Guide
Give notice that you are running a loopback
test.
Calls on all T1 or PRI lines on the DTI will be
automatically dropped when a loopback test is
invoked. Use the Page feature to notify people
using the system that a test is about to begin and
that calls will be disconnected.
The display shows Cd2-KSU.
.
Installer password required
P0992638 03

Advertisement

Table of Contents
loading

Table of Contents