Installation Handoff Checklist

Pre-Installation Checklist
Delivery Date:
Physical Requirements of Site
1.) Room size adequate for intended equipment configuration?
2.) Floor is strong enough for intended equipment and mounting methods
3.) Delivery route accommodates all intended equipment?
4.) Radiation physicist consulted?
5.) Necessary alterations made to circumvent obstructions?
6.) Modifications to room finished?
7.) Supports, platforms materials been provided?
8.) Support structures installed for floor and wall mounted equipment?
9.) Has floor been modified for cable ducts?
10.) Electrical service in place – at the ratings specified in pre-installation
11.) Power available to operate power tools?
12.) All non-electrical lines (air, water, oxygen, vacuum) installed?
Interconnections
1.) Signal cable, power and grounding plans produced?
2.) Necessary interconnection hardware, such as junction boxes, conduit or
3.) Interconnection hardware installed?
4.) Flexible, stranded wire provided for System input power connection?
5.) System "feeder" power cables pulled and sufficient length available at
6.) Interconnecting cables continuity checked, and labeled?
7.) All high voltage cable lengths verified?
8.) Interface information available for equipment?
6
EVISION
Customer:
Equipment:
approved – seismic regulatory codes considered?
documentation?
raceways, and fittings provided?
disconnect box for connections?
Chapter 3 - - Installation Guide
B
XR118 S
RIVO
Sales Person:
FDO No.:
M
ERVICE
ANUAL
Room #
Completed
Completed
Page 39