Chapter 2 Before You Begin; Introduction; Objective And Scope Of This Manual - GE Healthcare Brivo XR118 Service Manual

Table of Contents

Advertisement

GE H
EALTHCARE
D
5461425-8EN, R
IRECTION
Chapter 2 - Before You Begin
Section 1.0

Introduction

The goal of this document is to guide the service representative through an entire X-ray room
installation.
The following On-site Requirements must be accounted for prior to beginning installation of the
system.
Section 2.0

Objective and Scope of this Manual

This direction will lead you in a correct sequence through the manuals needed to install the
equipment. Following the suggested sequence will result in an orderly installation. However,
extenuating circumstances may dictate a deviation from the recommended sequence. Feel free to
deviate, but keep track of your progress by checking off the tasks in the flowchart as you complete
them.
Check equipment according to the packing list for your system against the main catalog numbers
in the FDO (Field Delivery Order). Also, verify that all the manuals are present in the binders
according to the Table of Contents.
Before starting to install the system, identify all the cables and check their length to verify that they
are long enough. If you find a short cable, contact us immediately so we can send the required
length cable to you and thereby, not delay the installation.
2.1
Pre-Installation Check
Pre-installation planning should be complete. Inspect the pre-installation "checklist", found in GEHC
document 5461785-8EN (Brivo XR118 System Pre-Installation Manual), and verify that the tasks
specified have been completed. Immediately arrange for completion of any tasks still not
completed.
2.2
Installation Plan
The main steps in the installation plan are easily seen by referring to the Table of Contents of this
document. The plan objectives are to:
Give a logical installation order which recognizes mechanical and electrical interface areas.
Test and adjust each subsystem independently.
To obtain a good overall view of how these objectives are to be achieved review the Table of
Contents for this document before beginning the installation work. Then, if it is necessary to deviate
from the stated plan, you will be aware of the essential interface area. This document will give you
the information required to make another effective plan that applies to particular situations.
6
EVISION
Chapter 2 - - Before You Begin
B
XR118 S
M
RIVO
ERVICE
ANUAL
Page 33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents