Pre-Installation Checklist - GE Innova 2121-IQ Biplane Preinstallation Manual

Cardiovascular imaging system
Table of Contents

Advertisement

GE Healthcare

5 Pre-Installation Checklist

GEHC Global Order # :
GEHC On-site Representative :
Name of customer reviewed with :
GEHC PMI :
Target Site Prep Completion Date:
The customer is responsible for proper site preparation and site readiness regardless of any GEHC inspections/assessments.
For MR Magnet Delivery: Ensure cryogen vents, power for the cooling system and exhaust fan system are installed and operational (0.7T, 1.5T
& 3T) and chilled water supply is available 24x7 that meets system cooling equipment requirements.
Inspection Date:
Item #
GEHC Minimum Requirements
Equipment installation drawings must
match actual room size and must meet
clearance requirements. Deviations that
1
meet installation requirements may be
red-lined, if red-lining is allowed by local
code. Seismic requirements are identified
on construction drawings.
Delivery route to installation or storage
area meets requirements and has been
discussed and scheduled with the custom‐
2
er. Ensure floor protection is discussed,
requirements identified, and will be avail‐
able at time of delivery and installation.
Rooms that will contain equipment, includ‐
ing storage areas, are dust free. Room
security to prevent unauthorized access
3
and theft has been discussed with cus‐
tomer. The customer is aware of these
security issues, implications and respon‐
sibility.
In room HVAC ductwork and units (in
room) must be mechanically installed and
dust free. Installation rooms appear to
meet environmental conditions (see Fur‐
4
ther Definitions) and observed issues
have been communicated to the custom‐
er. If being stored, storage area must meet
PIM storage criteria.
Ceiling grid is installed, Unistrut is located
5
per the installation drawings, and perma‐
nent lighting is installed and operational.
Floor is clean and prepared for final floor
covering. Customer has verified floor lev‐
eling meets the equipment installation
6
drawings and PIM specs and no visible
defects are observed. Gantry and table
baseplate are installed prior to delivery (if
applicable)
202
Innova 2121-IQ/3131-IQ Biplane Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare Site Readiness Checklist
Storage:
Is item
ready?
Customer:
MI Supplier:
Lead Installer:
Phone Number:
Helper:
Predict (Pre-ship)
Verify (Deliv‐
Is this
Will
item
item be
ready?
ready?
X
X
X
Direction 5177951-4-1EN, Revision 1
Validate
(Mech In‐
ery):
stall):
If "N", please enter in com‐
Is item
Is item
ready?
ready?
X
5 Pre-Installation Checklist
Comments
ments or action plan