GE Healthcare Brivo XR118 Service Manual page 66

Table of Contents

Advertisement

GE H
EALTHCARE
D
5461425-8EN, R
IRECTION
8.3
System Software Installation
8.3.1
Personnel Requirements
Required
Persons
8.3.2
Overview
Note:
Page 66
6
EVISION
Preliminary
Reqs
1
5 mins
The following times are typical for a complete system LFC:
1.) Five Minutes to backup system files to CD/DVD.
2.) Approximately ninety minutes to save images and protocols.
3.) Fifteen minutes to install the OS and Applications software.
4.) Five Minutes to restore system files from CD/DVD.
5.) Five minutes to cleanup and return system to operational readiness.
5461425-8EN
Only use this System Installation procedure to re-install and/or upgrade your system software
completely. The following procedure installs both the operating system, and application
software.
Pay particular attention, if instructed, to system resets. It's important that power be cycled
according to a specified procedure. Cycling power at the wrong time or by the wrong method
can result in a PC's operating file system (Linux) becoming corrupted. If the OS on the PC gets
corrupted, you may have to reload it again or start over.
The following SW procedure assumes that you are beginning with the System powered "ON"
and application software running (i.e. System Operationally Ready).
Configure the Time Zone after software re-installation or upgrade.
Section 8.0 - Software Installation
Procedure
15 (Time estimate does not include saving
and restoring patient images and/or
protocols files)
B
XR118 S
M
RIVO
ERVICE
ANUAL
Finalizati
on
0 min

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents