1.) Walls and floor clear of all obstructions?
2.) Walls finished?
3.) Finished floor installed?
4.) Room lights installed?
5.) Dust-creating work completed?
6.) Old equipment within room removed?
7.) Component positions clearly marked on floor?
8.) Space available to store equipment?
9.) Lock on door, or locked room available?
10.) Room IP Addresses for DICOM and Broadband identified?
11.) Broadband connection provided for InSite connection?
12.) Have all fire/safety inspections for occupancy been completed?
13.) Send completed checklist to the GE Healthcare installation team.
Comments:
Inspection Date(s):
Installation Project Manager Signature
Page 40
6
EVISION
Section 2.0 - Installation Handoff Checklist
B
XR118 S
M
RIVO
ERVICE
ANUAL
Completed

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents