Daikin FTX-N/U Manual page 165

Table of Contents

Advertisement

FTX-N/U, FVXS-N, FDMQ-R Series
09/12 class
[Method of mounting conduit]
• A protection plate is fixed for protection from the high-voltage section.
1) Dismount the stop valve cover by removing the screw.
2) Dismount the protection plate by removing the 2 screws.
3) Dismount the conduit mounting cover by removing the 2 screws.
4) Pass wires through the conduit and secure them with a lock nut.
5) After completing the work, reattach the stop valve cover, the conduit mounting cover, and the protection plate to its
original position.
1
2
L
1
L
2
Lock nut
15/18/24 class
[Method of mounting conduit]
1) Dismount the service lid by removing the 2 screws.
2) Pass wires through the conduit and secure them with a lock nut.
3) After completing the work, reattach the service lid to its original position.
1
2
L
1
L
2
Conduit mounting plate
Lock nut
01_EN_3P572321-3.indd
10
Power supply
terminal block
3
Shape wires so
that the protection
plate and conduit
mounting plate fit
securely.
Conduit
mounting
plate
Conduit
Power supply
terminal block
3
Shape wires so
that the protection
plate and conduit
mounting plate fit
securely.
Conduit
1
2
3
1
2
3
163
EDUS091558E
Protection plate
1
2
3
Screws
Conduit
mounting
cover
Screws
Service lid
Screws
10
3P572321-3
2019/06/19
14:17:27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fvxs-nFdmq-r series

Table of Contents