Daikin FTX-N/U Manual page 104

Table of Contents

Advertisement

FTX-N/U, FVXS-N, FDMQ-R Series
Half concealed installation
1) The size of a wall opening space shown in the illustration on
the right.
2) The rear of the unit can be fixed with screws at the points shown in the illustration as below. Be sure to install the propping
object in accordance with the depth of the inner wall.
Screw hole
Fixing point
5-7/8 (150)
on the back
9-13/16 (250)
CAUTION
The propping object for installing the main unit must be used, or there will be a gap between the unit and the wall.
3) Secure the indoor unit using 6 screws. (2 screws for floor and 4 screws for rear wall)
4) Once refrigerant piping and drain piping connections are complete, fill in the gap of the through hole with putty.
Any gaps will result in the accumulation of condensation on the refrigerant pipe and drain pipe, as well as allowing
the intrusion of insects and dirt.
5) Attach the left, right and upper casings in their original positions
using 7 screws.
6) Attach the front grill in its original position using 4 screws.
7) Attach the front panel in its original position.
• Attach the string to the right, inner-side of the front grille.
• Close the front panel and slide until the 2 stoppers click outside.
CAUTION
• Use drain pan edge for horizontal projection of the indoor unit.
• Install the indoor unit flush against wall.
01_EN_3P379970-7B.indd 10
25-3/8 (644)
Screw hole
5-1/2 (140)
Opening hole
9-1/16 (230)
Propping object
(field supply)
2 screws
H
Indoor unit fixing screws
3/16" × 1" (M4 × 25mm)
26-3/8 – 27-3/16
(670-690)
Open size
Opening space
Floor
3-3/4 (95)
4 screws
H
Indoor unit fixing screws
3/16" × 1" (M4 × 25mm)
Slide the stoppers
102
EDUS091558E
unit: inch (mm)
Propping object
(field supply)
9-13/16 (250)
7-7/8 (200)
unit: inch (mm)
10
C: 3P379970-7B
11/12/2015 13:29:55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fvxs-nFdmq-r series

Table of Contents