CHAPTER 6

Preparation Overview

Site Preparation Checklist for EX4300 Switches

Table 56: Site Preparation Checklist

Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure the distance between external power
sources and the switch installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Copyright © 2015, Juniper Networks, Inc.
Cabinet Requirements for EX4300 Switches on page 92
The checklist in
Table 56 on page 83
preparing a site for EX4300 switch installation.
For More Information
"Environmental Requirements and
Specifications for EX Series
Switches" on page 84
AC Power Supply Specifications
for EX4300 Switches on page 97
DC Power Supply Specifications
for EX4300 Switches on page 102
summarizes the tasks you need to perform when
Performed by
Date
83