Site Preparation Checklist For A Qfx3600 Or Qfx3600-I Device - Juniper QFX5110 Series Hardware Documentation

Virtual chassis fabric
Hide thumbs Also See for QFX5110 Series:
Table of Contents

Advertisement

Table 13: Site Preparation Checklist (continued)
Item or Task
Secure the rack or cabinet to the floor
and building structure.
Cables
Acquire cables and connectors:
Determine the number of cables
needed based on your planned
configuration.
Review the maximum distance allowed
for each cable. Choose the length of
cable based on the distance between
the hardware components being
connected.
Plan the cable routing and management.
RELATED DOCUMENTATION
General Safety Guidelines and Warnings | 203
General Site Guidelines
QFX5100 Standalone Installation Overview | 276
Mount a QFX5100 Device in a Rack or Cabinet | 279

Site Preparation Checklist for a QFX3600 or QFX3600-I Device

The checklist in
Table 13 on page 92
QFX3600 or QFX3600-I device installation.
For More Information
Port Panel of a QFX5100-24Q
Device on page 32
Port Panel of a QFX5100-24Q-AA
Device
Port Panel of QFX5100-48S and
QFX5100-48SH Devices on
page 36
Port Panel of QFX5100-48T and
QFX5100-48TH Devices on
page 39
Port Panel of a QFX5100-96S
Device on page 41
summarizes the tasks you need to perform when preparing a site for
Performed By
Date
93

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents