Powering Off A Qfx5110 - Juniper QFX5110 Series Hardware Documentation

Virtual chassis fabric
Hide thumbs Also See for QFX5110 Series:
Table of Contents

Advertisement

8. (Optional, but recommended) Delete the VCP or VCPs on the device that was removed:
user@device> request virtual-chassis vc-port delete pic-slot pic-slot port port-number member
member-id
9. (Optional, but recommended) Reset the fabric and mixed mode settings.
If you are removing a device that was part of a VCF composed entirely of the same device:
user@device> request virtual-chassis mode fabric disable reboot
If you are removing a device that was part of a mixed VCF:
user@device> request virtual-chassis mode fabric mixed disable reboot
Reboot the device to complete the process.
We recommend resetting the fabric and mixed mode settings immediately after removing it from the
VCF to avoid any potential issues with your device if it is placed in your network in another role.
RELATED DOCUMENTATION
Adding a Device to a Virtual Chassis Fabric | 394
Autoprovisioning a Virtual Chassis Fabric | 368
Preprovisioning a Virtual Chassis Fabric | 373
Understanding Virtual Chassis Fabric Configuration | 4
Understanding Virtual Chassis Fabric Components

Powering Off a QFX5110

Before you remove the power cord to power off a QFX5110:
Ensure that you have taken the necessary precautions to prevent electrostatic discharge (ESD) damage.
See
"Prevention of Electrostatic Discharge Damage" on page
Ensure that you do not need to forward traffic through the switch.
Ensure that you have the following parts and tools available to power off the switch:
An ESD grounding strap
An external management device such as a PC
242.
406

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents