Packing A Qfx5110 Switch For Shipping; Packing Qfx5110 Components For Shipping - Juniper QFX5110 Series Hardware Documentation

Virtual chassis fabric
Hide thumbs Also See for QFX5110 Series:
Table of Contents

Advertisement

If you are returning the chassis, an appropriate screwdriver for the mounting screws used on your rack
or cabinet.
This topic describes:

Packing a QFX5110 Switch for Shipping

To pack a QFX5110 for shipping:
1. Power down the switch and remove the power cables. See
2. Remove the cables that connect the QFX5110 to all external devices.
3. Remove all field-replaceable units (FRUs) from the switch.
4. Have one person support the weight of the switch while another person unscrews and removes the
mounting screws.
5. Remove the switch from the rack or cabinet (see QFX5110 Installation Safety Guidelines) and place the
switch in an antistatic bag.
6. Place the switch in the shipping carton.
7. Place the packing foam on top of and around the switch.
8. If you are returning accessories or FRUs with the switch, pack them as instructed in
Components for Shipping" on page
9. Replace the accessory box on top of the packing foam.
10. Close the top of the cardboard shipping box and seal it with packing tape.
11. Write the RMA number on the exterior of the box to ensure proper tracking.

Packing QFX5110 Components for Shipping

CAUTION:
boxes if they do not fit together on one level in the shipping box.
606.
Do not stack switch components. Return individual components in separate
"Powering Off a QFX5110" on page
"Packing QFX5110
606
406.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents