Figure 45: Unpacking A Line Card Used In An Ex9200 Switch - Juniper EX9214 Hardware Manual

Ex series
Hide thumbs Also See for EX9214:
Table of Contents

Advertisement

Related
Documentation
Copyright © 2017, Juniper Networks, Inc.
CAUTION:
The line cards are maximally protected inside the shipping carton.
Do not unpack the line cards until you are ready to install them in the switch
chassis.
Before you unpack a line card:
Ensure that you have taken the necessary precautions to prevent electrostatic discharge
(ESD) damage (see
"Prevention of Electrostatic Discharge Damage" on page
Ensure that you know how to handle and store the line card (see
Line Cards in EX9200 Switches" on page
To unpack a line card (see
Move the shipping carton to a staging area as close to the installation site as possible.
1.
Position the carton so that the arrows are pointing up.
2.
Open the top flaps on the shipping carton.
3.
Pull out the packing material, which holds the line card in place.
4.
Remove the line card from the antistatic bag.
5.
Save the shipping carton and packing materials in case you need to move or ship the
6.
line card later.

Figure 45: Unpacking a Line Card Used in an EX9200 Switch

Installing a Line Card in an EX9200 Switch on page 220
EX9204 Switch Hardware Overview
EX9208 Switch Hardware Overview
EX9214 Switch Hardware Overview on page 3
215).
Figure 45 on page
133):
Chapter 10: Unpacking the Switch
329).
"Handling and Storing
133

Advertisement

Table of Contents
loading

Table of Contents