Juniper EX9214 Hardware Manual page 188

Ex series
Hide thumbs Also See for EX9214:
Table of Contents

Advertisement

EX9214 Switch Hardware Guide
Related
Documentation
164
Switch, Connecting DC Power to an EX9208 Switch, or
EX9214 Switch" on page
Verify that the
BREAKER ON
10.
Verify that the
LED glows steady green, indicating the power supply is correctly
11.
PWR OK
installed and functioning normally.
If the power supply is not functioning normally, repeat the installation and cabling
procedures.
NOTE:
After powering off a power supply, wait for at least 60 seconds
before turning it back on. After powering on a power supply, wait for at
least 60 seconds before turning it off.
If the system is completely powered off when you power on the power
supply, the Routing Engine boots as the power supply completes its startup
sequence. If the Routing Engine finishes booting and you need to power
off the system again, first issue the CLI
After a power supply is powered on, it can take up to 60 seconds for status
indicators—such as the status LEDs on the power supply and the
show chassis
functioning normally. Ignore error indicators that appear during the first
60 seconds.
On the external management device connected to the Routing Engine, monitor the
12.
startup process to verify that the system has booted properly.
Installing a DC Power Supply in an EX9204 Switch
Installing a DC Power Supply in an EX9208 Switch
Installing a DC Power Supply in an EX9214 Switch on page 193
158.
LED glows steady green.
command display—to indicate that the power supply is
"Connecting DC Power to an
request system halt
command.
Copyright © 2017, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

Table of Contents