CHAPTER 6
Preparation Overview
Site Preparation Checklist for an EX9214 Switch
Copyright © 2017, Juniper Networks, Inc.
Site Preparation Checklist for an EX9214 Switch on page 83
Environmental Requirements and Specifications for EX Series Switches on page 85
General Site Guidelines on page 89
Site Electrical Wiring Guidelines on page 89
Rack Requirements on page 90
Cabinet Requirements on page 91
Clearance Requirements for Airflow and Hardware Maintenance for an EX9214
Switch on page 92
The checklist in
Table 37 on page 83
a site for installing an EX9214 switch.
Table 37: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors
such as temperature and humidity
do not exceed switch tolerances.
Power
Measure distance between external
power sources and switch
installation site.
summarizes the tasks you need to perform to prepare
For More Information
"Environmental
Requirements and
Specifications for EX Series
Switches" on page 85
Performed
by
Date
83