Ball Bearing Service Counter-Balance (185400) - Briggs & Stratton Vanguard 05000 Manual

Single cylinder ohv air-cooled engines
Table of Contents

Advertisement

Fig. 16
Installation: PTO-Side Ball Bearing
Bearing Installation Tools: (Refer to Fig. 17).
• Washer
([A] #225136)
• Support
([B] #19394)
• Puller Screw
([C] #19318)
• Pilot
([D] #19396)
1. Lubricate outside of bearing.
2. Install shim(s) - if used.
3. Assemble washer (A) to puller screw (C).
4. Insert large end of pilot (D) into seal boss
of cover.
5. Insert puller screw (C) through pilot (C)
and thread into support (B).
Fig. 17
6. Tighten screw until bearing is seated.
7. Install new oil seal. Use large end of tool
and press seal until flush with
(#19320)
cover.
8. Install thrust washer and governor gear.
Push governor gear and cup on to shaft
as far as it will go.
Ball Bearing Service Counter-Balance
(185400)
Removal: Counter-Balance Ball Bearing
Bearing Removal Tools: (Refer to Fig. 18)
• Puller Nut
([A] #19406)
• Puller Stand-Off
([B] #19408)
• Nut-Hex
([C] #92278)
• Screw-Hex
([D] #94373)
1. Remove nut-hex (C) and screw-he x (D)
from flywheel puller
2. Place a flat washer with a 1/4" hole on
screw assembly and insert through puller
stand-off (B).
3. Thread screw-hex (D) into puller nut ( A).
4. Insert assembly through ball bearing until
puller nut (A) engages bearing race.
5. Turn nut (C) down to puller stand-off (B).
6. Hold screw from turning and turn nut until
bearing comes free of cylinder or cover.
Fig. 18
.
(#19069)
195
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents