Chapter 3 Removal and Replacement Procedures
Revision B
6) Secure the COVER INLET to the printer
with the two screws (silver, tap, 12mm).
7) Mate the notch of the BRACKET SW
with the hook of the GUIDE HARNESS
AC.
8) Mate the holes of the BRACKET SW
with the two bosses of the printer, secure
the BRACKET SW with the two screws
(silver, tap, 8mm).
3 - 215
Confidential
Epson AcuLaser C2900N