Continue First-Time Startup; Figure 19: Default Screen, With No Load, For 3-Phase Output; Figure 20: Normal Display, System Under Load (3-Phase Output) - Gamatronic POWER+ User Manual

Parallel multi-system configuration
Hide thumbs Also See for POWER+:
Table of Contents

Advertisement

During this step, the LEDs are also checked sequentially.
3.
Finally, the normal default screen is displayed.
LOAD LEVEL
L1:__________
L2:__________
L3:__________
IMPORTANT NOTE:
YOUR POWER
(If the voltage and frequency settings are correct, continue with section 3.5.1 below.)
3.5.1

Continue first-time startup

1.
Switch all battery switches "ON" – on the UPS and on all battery cabinets, if any.
2.
You can now turn on the load devices.
3.
After turning on the load devices, verify that you have a normal reading on the display screen. The
display will look similar to Figure 20, but of course your readings will be different.
LOAD LEVEL
L1:
L2:
L3:
_______

Figure 20: Normal display, system under load (3-phase output)

Continue with section 3.6 on page 26.
POWER +
UPS,
PARALLEL
USER GUIDE
G
AMATRONIC
000A, 230V
000A, 230V
000A, 230V

Figure 19: Default screen, with no load, for 3-phase output

+
SYSTEM HAS BEEN DELIVERED TO YOU WITH THE OUTPUT VOLTAGE AND
FREQUENCY SET TO MATCH YOUR REQUIREMENTS
SETTINGS ARE CORRECT
/
TO SET MODULE
S FREQUENCY
/
TO SET MODULE
S VOLTAGE
_____
015A, 230V BATTERY:
______
012A, 230V UPS OK
011A, 230V STSW OK
,
. 2.0
REL
E
I
L
LECTRONIC
NDUSTRIES
TD
---21:20:25---
BATTERY:
UPS OK
STSW OK
.
,
7.9.2
SEE SECTION
,
7.9.3
SEE SECTION
---11:20:25---
.
864V
(ON)
(INV)
.
CHECK NOW TO VERIFY THAT THESE
86.
ON PAGE
87.
ON PAGE
868V
(ON)
(INV)
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents