3.2
Inspections to be performed prior to installation
TYPE OF CHECK
Ambient temperature in the immediate
1.
location of the equipment
2.
Humidity and condensation
3.
Ventilation
4.
Foundation and route to installation site
When planning the location of the UPS
5.
units, room for access to battery
cabinets and electrical boards is critical.
Circuit breakers on the electrical board
6.
supplying the system
Diameter of input and output power
7.
cable connections, PE (Gnd) and
neutral lines.
Lightning / Voltage surge protection on
8.
electrical board supplying the system.
9.
Ac input voltage
10.
Voltage between neutral and ground
11.
System installation and start-up
* Or other, according to nominal voltage rating of local power mains.
12
G
E
I
AMATRONIC
LECTRONIC
Table 2: Pre-installation inspections
REQUIREMENT
Recommended: between 15°C and 25°C
Required: between 0°C and 40°C
Verify that there is no water condensation or
dampness within the installation site
Verify that sufficient airflow or forced ventilation is
provided for battery cabinets location
Verification of adequate structure, space and
clearance for dimensions and weights of the UPS
units and their battery cabinets
Verify 91 cm (36 in.)clearance at rear for cable
connections and 100 cm (39 in.) at front for user
access and service
Must be in accordance with Gamatronic system
specifications and connection schematic
Must comply with local and international codes, and
be appropriate for the circuit breakers protecting
them. Refer to connections schematic.
Voltage surge suppressors type B must be installed
between each phase and the neutral line:
Ratings: 300 Vac for 220-230 Vac mains.
Phase-to-Phase: 400* Vac, +10 %, -15 %
Phase-to-Neutral: 220* Vac, +10 %, -15 %
0 – 2 Vac
Must be performed only by authorized personnel in
accordance with connection schematic, Gamatronic
system specifications and this User Guide