Current sharing

When two or more Power+ units are operated in parallel, it is required that their current-sharing terminals be
connected together: yellow to yellow, orange to orange, red to red, and blue to blue. Connecting two or
more Power+ units via their current-sharing terminals causes current-sharing to be take place between all
the modules of both systems together.
When three or more Power+ units are operated in parallel, their current-sharing terminals must be
connected together in series; for example:
Connect the current-sharing terminals on UPS "x" to those on UPS "y", and connect the current-sharing
terminals on UPS "y" to those on UPS "z".
When connecting current-sharing terminals, it is irrelevant which UPS is the "master" UPS and which are
the "slaves".
22
G
E
AMATRONIC
LECTRONIC

Figure 13: Current sharing connections for 3 UPSs

I
L
.
NDUSTRIES
TD
POWER +
PARALLEL
UPS,
,
. 2.0
USER GUIDE
REL

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents