Installation procedure and system start-up

Remove rear covers and connect ac input and output power cables to terminals according to markings as shown
in this User Guide and according to connection schematic.
1.
Verify correct phase sequence between board and UPS.
Connect neutral and ground lines to busses according to markings as shown in this User Guide manual and
2.
according to connection schematic. Verify secure connections.
Connect parallel, communication, and current sharing cables as shown in the connection schematic Figure 8 on
3.
page 15.
Connect the DC power cables of the battery cabinets to the UPS terminals according to markings as shown in
Figure 7 through Figure 9 on pages 14 through 17. Connect neutral and ground lines to busses as above.
Verify correct polarity of the connections (+ / N / -) Between the Battery Cabinets C.B.s / Terminals and the UPS
4.
terminals. Auxiliary contacts of Battery C.B.s are connected to UPS Controller inputs "Bat CB" and "Com" as
marked, and as shown in Figure 11 and Figure 12 on pages 20 and 21.
An external n-pole / N.C. EPO switch may be connected according to connection schematic. EPO disconnection
of parallel units MUST BE SIMULTANEOUS! EPO wiring and switch rating must be
5.
5A / 230 Vac.
Before connecting power to each system verify again that all connections are secure and are according to
6.
instructions and schematics.
Follow the instructions in section 3.5 "First-time Startup" on page 24 for each UPS unit separately. Verify that the
7.
output switches on the other units are disconnected.
Before connecting outputs in parallel: VERIFY PHASES ALIGNMENT BETWEEN SYSTEMS by measuring
Voltages between same phases of each UPS unit (R1-R2, S1-S2, T1-T2) : Results must be less than 5V to
show alignment.
8.
This check must be performed twice: when the output is connected to the inverter, and when the output is
connected to bypass.
To connect three units in parallel, see "Connecting multiple Power+ units in parallel", starting page 28.
9.
POWER +
UPS,
PARALLEL
USER GUIDE
G
E
AMATRONIC
LECTRONIC

Table 3: Installation procedure

OPERATION
,
. 2.0
REL
I
L
.
NDUSTRIES
TD
13