REMOVAL/INSTALLATION
Remove the inner cover (page 3-5).
Turn the ignition switch to OFF.
Disconnect the ECM 6P and 26P connectors.
Remove the bolts and ECM.
Installation is in the reverse order of removal.
NOTE:
MAIN RELAY
•
SYSTEM INSPECTION
Make sure the battery line and ignition switch cir
cuit of the ECM is normal, before performing this
inspection.
Remove the inner cover (page 3-5).
Remove the main relay.
1 . Main Relay Power Voltage Inspection
Turn the ignition switch to OFF.
Measure the voltage between the Red wire ter
minal and ground.
Is there battery voltage?
NO
YES
•
•
Check for a n open or short circuit in '--- -.,.,. .
-
the wire harness.
Check for a blown main fuse (20A).
GO TO STEP 2.
-
BATTERY/CHARGING SYSTEM
1 6- 1 1