27 . Press any button on the front panel display to activate the menu options, and then press the button until
the TURN UPS ON/OFF menu displays.
28. Press the
29. Confirm the selection. Press and hold the
a.
Verify that the ~ indicator illuminates solid, indicating that the UPS is operating normally and is in
parallel with all other BladeUPS modules in the system.
b.
If the indicator is flashing, do not proceed until all alarms are clear. Check the UPS status from the
front panel to view the active alarms. Correct the alarms and restart if necessary.
30. If loads are to be connected to the load connector receptacle, connect the loads before turning on the load
connector breaker.
31. Press the
32. If optional EBMs are installed, see to set the number of installed EBMs.
33. To change any other factory-set defaults, see "Operation" on page 93.
34. If connecting to a REPO circuit, use procedure on pages 110 thru 112. Use caution while connecting the
REPO as to not EPO operating systems.

Standalone UPS Initial Startup

To start up a standalone UPS:
1.
Plug the equipment to be protected into the UPS, but do not turn on the protected equipment
(see Figure 60 on page 74).
2.
Make any necessary provisions for cord retention and strain relief.
3.
Verify that all UPS circuit breakers are in the OFF (O) position.
4.
Verify that the UPS power cord is plugged in.
5.
Switch on utility power where the UPS is connected.
6.
Remove the breaker ties from the circuit breakers.
7 .
Switch the UPS input circuit breaker to the ON (
8.
Wait for the UPS front panel display to illuminate.
The
9.
Check the UPS front panel display for active alarms or notices (other than "Batteries Disconnected").
Resolve any active alarms before continuing. See "Service and Troubleshooting" on page 131.
10. Switch the UPS battery circuit breaker to the ON (
11. If optional EBMs are installed, switch all EBM battery circuit breakers to the ON (
button to display the TURN UPS ON option; press the
ESC
button until the Start screen appears.
NOTE
Verify that the total equipment ratings do not exceed the UPS capacity to prevent an
overload alarm.
NOTE
The load connector breaker controls the load connector only, not the output power
cord.
indicator flashes on the UPS.
Eaton BladeUPS 5.1 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 9 www.eaton.com/powerquality
button.
button for three seconds, until the UPS stops beeping.

) position.

) position.
Standard System Installation

) position.
88