Eaton BladeUPS User Manual page 54

For use with eaton bladeups 5 kva to 60 kva (n+1) systems
Hide thumbs Also See for BladeUPS:
Table of Contents

Advertisement

Clip Nuts
Figure 35. Securing the Rear Rail
5.
Repeat Steps 3 and 4 for the other rail.
6.
Tighten the assembly wing nuts on both rail assemblies.
The EBM is heavy (see page 130). Moving the EBM requires a minimum of two people.
7 .
Place the EBM on a flat, stable surface with the front of the EBM facing toward you.
8.
If the mounting brackets are not already installed, align the two mounting brackets with the screw holes
on the side of the EBM and secure with the supplied 6-32 flat-head screws (see Figure 36).
9.
Attach the EBM front cover:
Align the pins on the rear of the front cover with the openings in the EBM. Push the cover firmly into
place. See Figure 36.
6-32 Flat-Head
crews
Mounting
Bracket
Figure 36. Installing the EBM Mounting Brackets
10. Slide the EBM into the rack.
Eaton BladeUPS 5.1 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 9 www.eaton.com/powerquality
Preassembled System Installation
CAUTION
47

Advertisement

Table of Contents
loading

Table of Contents