Eaton BladeUPS User Manual page 45

For use with eaton bladeups 5 kva to 60 kva (n+1) systems
Hide thumbs Also See for BladeUPS:
Table of Contents

Advertisement

3.
Remove the six screws on the conduit landing plate and retain. Remove the plate and retain.
See Figure 22.
Ferrite Assembly (mounted)
Figure 22. Removing the Conduit Landing Plate
4.
Use a Greenlee
®
punch to provide one or more holes in the conduit landing plate to accommodate the
input and output wiring from the utility to the BladeUPS Bar.
5.
Replace the conduit landing plate, and attach approved electrical conduit to the plate.
6.
Pull approved electrical conductors to the system and connect the input, output, and ground wires to the
BladeUPS Bar terminal block according to Figure 18 and Table Route the three input phases and the input
neutral through the mounted or loosened ferrite assembly (see Figure 23).
Ground
Bottom Entry Terminal Block
Figure 23. BladeUPS Bar Terminal Block
Eaton BladeUPS 5.1 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 9 www.eaton.com/powerquality
Bottom Entry Rack
Preassembled System Installation
38

Advertisement

Table of Contents
loading

Table of Contents