14. Using four M5 machine screws, secure the front of the cabinet to the rack as shown in Figure 52.
Figure 52. Securing the Front of the UPS
15. Insert the two rear hold-down brackets on the rails into the slots on the rear of the cabinet (see Figure 53).
a.
If necessary, push out on the rack upright to allow the clearance needed to insert the bracket. The
rack upright flexes easily.
b.
Verify that the brackets seat firmly, then tighten the nuts on the rear hold-down brackets. The UPS is
now secured in the rack.
Figure 53. Inserting the Rear Hold-Down Bracket
NOTE
Treat the electronics module with care to avoid damaging the fans, connectors, or
internal circuitry.
16. Replace the electronics module by sliding it carefully into the cabinet. Push the electronics module firmly
to seat the connectors.
17 . Reinstall the electronics module locking screw (see Figure 50 on page 67).
18. On the UPS rear panel, plug in the supplied communication terminal block connectors as shown in
Figure 54.
19. Optional but recommended. Press the two supplied wire saddles into the holes on the rear panel, as
shown in During wiring installation, secure any wires to the connectors within the saddles.
Eaton BladeUPS 5.1 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 9 www.eaton.com/powerquality
Standard System Installation
Position 9
M5 crews
Position 4
68

Advertisement

Table of Contents
loading

Table of Contents