Eaton BladeUPS User Manual page 53

For use with eaton bladeups 5 kva to 60 kva (n+1) systems
Hide thumbs Also See for BladeUPS:
Table of Contents

Advertisement

Position 15
Position 10
Position 6
Position 1
Front Rail crew Positions
Figure 33. Rail Screw Positions for the EBM Bottom Installation
3.
Secure the rail to the front of the rack with two hex-head screws (see Figure 34).
Figure 34. Securing the Front Rail
4.
Using two clip nuts and two hex-head screws, attach the rail to the rear of the rack (see Figure 32 on
page 45 and Figure 35).
The bottom rail uses positions 38 and 40 for the rear hex-head screws. If you are installing additional rails,
place the next rail 7 holes above the last installed screw.
Eaton BladeUPS 5.1 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 9 www.eaton.com/powerquality
econd Rail
First Rail
Rear Rail crew Positions
Preassembled System Installation
Position 13
econd Rail
Position 11
Position 4
First Rail
Position 2
46