Eaton BladeUPS User Manual page 89

For use with eaton bladeups 5 kva to 60 kva (n+1) systems
Hide thumbs Also See for BladeUPS:
Table of Contents

Advertisement

9.
Tighten the screws securing the Powerware Hot Sync CAN Bridge Card in its X-Slot communication bay.
NOTE 1
Since there is only one UPS module, retain the redundant signal cable.
NOTE 2
Also retain one of the two pin terminal blocks, which has the small jumper wire,
used on the external connection terminal strip.
Whenever service is performed and the electronics module needs to be removed, the jumper
must be installed on the Standalone/Parallel terminals/pins on the UPS to ensure the internal
maintenance bypass works properly.
10. If you are installing power management software, connect your computer to the UPS communication port
or optional X-Slot card (see "Installing Communication Options and Control Terminals" on page 108). For
the communication port, use the supplied serial cable.
11. If you left the UPS unattached to the rack, secure the front and rear of the UPS as described in Step 14
and Step 15 on page 68.
12. If your rack has conductors for grounding or bonding of ungrounded metal parts, connect the ground cable
(not included) to the ground bonding screw. See Figure 60 on page 74 for the location of the ground
bonding screw.
13. You can install an optional REPO circuit that will shut down the entire parallel-ready system using a single
switch. See "Remote Emergency Power-off" on page 112 to install the REPO switch before powering on
the parallel-ready system.
14. Connect the parallel input cord from each paralleled UPS, as shown in Figure 67:
Loosen the two screws on the plug retainer and slide the plug retainer out.
l
Gently loop and twist the parallel input cord as shown to minimize stress on the cord. The loop and
l
twist for each cord may vary depending on configuration and strain relief to the BladeUPS Bar in the
rack.
Insert the parallel input cord into the socket. The plug is fully seated when the plug latches snap into
l
place.
NOTE
Make sure the connectors are snapped in tightly to prevent incorrect system
operation.
Slide the plug retainer back in and tighten the screws.
l
NOTE
The plug retainer prevents the plug from being inadvertently unplugged.
15. Continue to "Parallel System Initial Startup" on page 89.
Eaton BladeUPS 5.1 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 9 www.eaton.com/powerquality
!
IMPORTANT
Standard System Installation