INSTALLATION

Standalone UPS Initial Startup

To start up a standalone UPS:
NOTE Verify that the total equipment ratings do not exceed the UPS capacity to prevent an
overload alarm.
1.
2.
3.
NOTE The load connector breaker controls the load connector only, not the output power
cord.
4.
5.
6.
7.
8.
9.
10. Switch the UPS battery circuit breaker to the ON (
11. If optional EBMs are installed, switch all EBM battery circuit
12. Verify that the Batteries Disconnected" alarm has cleared. Verify
66
EATON Powerware
Plug the equipment to be protected into the UPS, but do not turn
on the protected equipment (see Figure 32 on page 49).
Make any necessary provisions for cord retention and strain relief.
Verify that all UPS circuit breakers are in the OFF (O) position.
Verify that the UPS power cord is plugged in.
Switch on utility power where the UPS is connected.
Remove the breaker ties from the circuit breakers.
Switch the UPS input circuit breaker to the ON (
Wait for the UPS front panel display to illuminate.
The
indicator flashes on the UPS.
Check the UPS front panel display for active alarms or notices
(other than Batteries Disconnected"). Resolve any active alarms
before continuing. See Troubleshooting" on page 119.
|
breakers to the ON (
) position.
that no other alarms appear on the UPS front panel display.
If the
indicator is flashing, do not proceed until all alarms are
clear. Check the UPS status from the front panel to view the active
alarms. Correct the alarms and restart if necessary.
®
BladeUPSt (12 kVA) User's Guide
|
) position.
S
164201649 Rev 3 www.powerware.com
|
) position.