17 . To change any other factory-set defaults, see "Operation" on page 93.
NOTE 1
Eaton recommends setting the Date and Time and the Start screen.
NOTE 2
Verify that the Parallel Operation Settings are set appropriately for your system. For
example, if you know the load will exceed the redundancy level of the system, set
the Parallel Operation Mode to "Capacity Mode" to prevent unnecessary alarms
(see Chapter 5, "Operation").
18. If you installed an optional REPO, test the REPO function:
Activate the external REPO switch. Verify the status change on the UPS display.
Deactivate the external REPO switch and restart the UPS.
19. See "Updating the UPS Firmware" on page 128.
NOTE 1
When adding a new UPS to a parallel system or updating one UPS's firmware, verify
that all UPSs in the parallel system are updated to the same firmware version.
NOTE 2
The batteries charge to 80% capacity in less than 5 hours. However, Eaton
recommends that the batteries charge for 48 hours after installation or if the system
is off for more than 30 days.
Eaton BladeUPS 5.1 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 9 www.eaton.com/powerquality
Preassembled System Installation
53