Rack Setup for the UPS

The UPS is heavy (see page 136). Removing the UPS from its carton requires a minimum of two
people. Use the corrugated lifting sling (packaged with the UPS) to move the UPS.
NOTE
Mounting rails are required for each individual cabinet.
To install the UPS rail kit:
1.
Select the proper holes in the rack for positioning the UPS in the rack (see Figure 46).
NOTE 1
The UPS rails take up position 1 through position 12. The UPS will take up 6U or 18
total hole positions.
NOTE 2
Verify that the hole patterns on the rails and mounting brackets align with the hole
pattern on the rack.
Bottom of Rack
or Top of Other
Cabinet
Figure 46. Front Rail Screw Positions for the UPS
Eaton BladeUPS 5.1 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 9 www.eaton.com/powerquality
CAUTION
Position 12
Top of Rail
Position 9
Mounting
Bracket
Position 4
Position 1
Bottom of Rail
Standard System Installation