Table 7. BladeUPS Bar Wiring Specifications
BladeUPS Bar
Terminal Block
Output
Input
Neutral
Safety Ground
* Use 13.3 mm
(6 A G) 90_C copper wire minimum.
2
6.
Remove the Wireway Access Cover.
- Install and attach approved electrical conduit to the holes previously added to the conduit landing
plate.
- Pull approved electrical conductors for the system, and connect the input, output, and ground wires
to the BladeUPS Bar top entry terminal block according to Figure 45 and Figure 7.
- Route the three input phases and the input neutral through the mounted or loosened ferrite assembly
(see Figure 44).
7 .
Replace the cabinet top panel:
- Locate the cabinet top panel.
- Align the top panel with the protruding mounting screws in the front (three screws) and back
(two screws).
- Push down the top panel to snuggly fit over the screws.
- Tighten the top panel screws.
8.
Replace the trim:
- Locate the top panel trim assemblies and the 12 screws that you removed previously.
- Replace the outside pairs of trim screws on the first trim assembly, and then replace the interior trim
screws.
- Repeat to install the second trim assembly.
9.
Replace the two upper side panels:
- Locate the two upper side panels and the key.
- Slide the bottom lip of the first panel into the track above the bottom panel.
- Push the panel forward until it is flush with the rack frame.
- Snap the panel into the latches.
- Lock the upper side panels with the key.
- Repeat to install the second panel.
Terminal
BladeUPS Bar
Position
Wire Function
1 [Output A]
2 [Output B]
3 [Output C]
4 [Input A]
5 [Input B]
6 [Input C]
7
8
9
Ground
Eaton BladeUPS 5.1 kVA to 60 kVA (N+1) User's Guide 164201649—Rev 9 www.eaton.com/powerquality
Terminal Wire
Size Rating*
Phase 1 Out
13.3 mm
2
Phase 2 Out
Phase 3 Out
ire gauge depends on
Phase 1 In
overcurrent protection rating
required (see Table 6 on
Phase 2 In
page 57). Reference the NEC,
Phase 3 In
NFPA 70 for wire sizing.
Neutral
Neutral
Neutral
Ground
2 mm
2
(14 A G) to 52 mm
Standard System Installation
Tightening
Torque
(6 A G) to 177 mm
31.1 Nm (275 lb in)
2
(350 kcmil)
2
(1/
6 Nm (50 lb in)
O)
62