Starting Your Server - Gateway 910 Series System Manual

Table of Contents

Advertisement

Starting your server

Before you start your server for the first time:
Make sure that the voltage selector switch on the back of the server is
set to the correct voltage for your area. This switch is set at the factory
to the correct voltage (see "Back" on page 3 for the voltage selector switch
location).
Make sure all cables are firmly connected to the proper ports on the back
of the server.
Caution
Make sure the server and monitor are plugged into an AC outlet or power
strip and that the power strip is turned on.
To start the server:
1
Turn on any components connected to the server, such as a monitor,
printer or scanner.
2
Turn on the server. The power indicator light-emitting diode (LED) on
the front of the server remains lit (green) when the power is on.
If nothing happens when you turn on the server:
Make sure that the power cables are securely plugged in and that
your power strip (if you are using one) is plugged in and turned on.
Make sure the monitor is connected to the server, plugged into the
power strip or AC outlet, and turned on. You may also need to
adjust the brightness and contrast controls on the monitor.
10
System Setup
Make sure your server and peripherals are turned off and
unplugged from the power outlet when you connect
peripherals to the server, or you might damage the server
or the peripherals.

Advertisement

Table of Contents
loading

Table of Contents