Server Handling Precautions - Sun Oracle Netra SPARC T3-1 Installation Manual

Hide thumbs Also See for Netra SPARC T3-1:
Table of Contents

Advertisement

2
Power supply status LEDs: - OK
(output): (green)
- Service Action Required: (amber)
- AC or DC (input power): (green)
3
Alarm port
4
Expansion slot 0 (PCIe 2.0 x8 or XAUI)
5
Expansion slot 3 (PCIe 2.0 x8)
6
Expansion slot 1 (PCIe 2.0 x8 or XAUI)
7
Expansion slot 4 (PCIe 2.0 x8)
8
Expansion slot 2 (PCIe 2.0 x8)
Related Information
"Front Panel Components" on page 13

Server Handling Precautions

Caution – Deploy the antitilt bar on the equipment rack before beginning an
installation.
Caution – The server weighs approximately 55 lb (25 kg). Two people are required
to lift and mount this 2U server into a rack enclosure when using the procedures in
this document.
10
SER MGT RJ-45 serial port
11
NET MGT RJ-45 network port
12
Network 10/100/1000 ports (NET0 to
NET3) for host
13
Physical Presence button access hole
14
USB 2.0 ports (USB 0, USB 1)
15
Video connector (HD-15)
16
Grounding studs
Preparing for Installation
15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Netra SPARC T3-1 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents