"Minimum Clearance for Service Access" on page 6
■
Shipping Kit Inventory List
Note – When you receive your server, place it in the environment where you will
install it. Leave the server in its shipping crate at its final destination for 24 hours.
This resting period prevents thermal shock and condensation.
Verify that you have received all of the components that ship with your server.
Netra SPARC T3-1 server
■
2 AC power cords (if ordered)
■
RJ-45 to DB-9 serial adapter
■
RJ-45 to DB-25 analog to digital video adapter
■
Antistatic wrist strap
■
19-inch, 4-post rackmount kit
■
Netra Rack Server Getting Started Guide with license and safety documents
■
12
Netra SPARC T3-1 Server Installation Guide • August 2013
Need help?
Do you have a question about the Netra SPARC T3-1 and is the answer not in the manual?
Questions and answers