INSTALLATION & SETUP
2.4
Installing a Lens,
Lamp & Cooling
2-16
•Use straps and/or cabling with load capacity adequate
for the total projection head and frame weight.
NOTE: Never exceed the Load Rating specified in the FredFrame
Rigging Kit instructions. Critical safety.
Refer to the complete instructions for using the FredFrame
installation instructions as well as mechanical adjustment procedures for proper
image alignment.
Use straps or cabling with load capacity adequate for
Stacking
To stack two projection heads together, you must first secure each head within a
FredFrame
, then secure all corners of the frames together using 4 stacking pins
(provided in the FredFrame
Adapter to route exhaust air from the bottom projector away from the top projector
(not required with a side-by-side projector row). Never stack more than 2 projection
heads together, and do not attempt to move stacked projectors without proper
transport equipment.
WARNING
• Remove the lens before hoisting.
WARNING
the projector/frame weight.
kit). You must also use the Side-Venting Exhaust
Stacking &
. These include all
CP2000-X User Manual
020-100031-01 Rev. 1 (03-2009)