Service Instructions Dishwashing Machine Model K-Tronic
ATTENTION!
Datei: 2K_9628652_Serviceanleitung-MIKE_EN_2005-09-01.doc
MEIKO Maschinenbau GmbH & Co. KG, Postfach 2040, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1174
The electrical connection data, voltage, type of current, output can be seen on the
manufacturers' plates on the machine.
Please check the voltage.
All electrical connections must be made inside the electrical switch cabinet by means of
marked screwed cable glands as in the circuit diagram and connected to the terminals
and the fuses provided.
Every time that electrical components are replaced, repaired or connected and
disconnected, a safety test must be conducted on at least the relevant
component!

2.4 Connection to energy optimisation units

The following points must be observed if the appliance is connected to an energy
optimisation unit:
1. Because of the voltage drop, the cable to the heating system contactor which is
to be used for the switching operation must be limited to a length of 100 metres
in the case of 1.5 mm
2. The disconnection period must not exceed 10 seconds per minute.
Ensure that the programs are extended by the disconnection period.
3

Commissioning

In order to avoid damage to the installation and the injury and death of persons when
commissioning the installation, the following points must be observed without fail:
Any necessary initial tests to parts supplied by sub-suppliers, such as heat pumps or
other equipment, must be carried out. More detailed information, if required, can be
found in the relevant Instructions for Use.
The installation may only be commissioned by suitably qualified persons
observing the safety instructions.
Before initial startup, check that any tools and parts not belonging to the
installation have been removed.
Check whether any escaping liquid is removed.
Activate all the safety systems and door switches before commissioning.
Check that all screw connections are tight.
Please also read the chapter on "General safety instructions ".
Commissioning and instructions will be provided by technicians specially trained by
Meiko. After these processes are complete, the installation will be handed over to the
authorized person who will sign for it. The appliance may only be used after the
instruction has been completed.
4

Instructions for commissioning

4.1 Works to be carried out before commissioning

All the points in this section must be observed before initial commissioning.
Water pipes
All pipes must be thoroughly flushed out. The heating system must not be switched
on when this is being done (remove the fuses) in order to prevent the heating
elements from operating when the system is dry. All dirt collectors must be cleaned
afterwards.
Steam pipes
All pipes must be thoroughly flushed out. When doing so, all control valves must be
fully open and all condensate traps removed. All dirt collectors must be cleaned
afterwards.
valid from: 2005-09-01

W e reserve the right to change execution and construction!

2
cross-section.
Update: 2006-11-14 / S.5
Ident No.: 9627429
Page 7/30

Hide quick links:

Advertisement

Chapters

loading