Download Print this page

Chemical Product Settings; Works To Be Carried Out Before Initial Commissioning; Preparation - Operation - Washing With Dish-Washer - Meiko K-Tronic Service Manual

Basket transport dishwashing machine

Advertisement

Operating instructions dishwashing machine model K-Tronic
Datei:2K_9626212_Betriebsanleitung-MIKE_EN_2005-12-01.doc
MEIKO Maschinenbau GmbH & Co. KG, Postfach 2040, D-77652 Offenburg, Tel.: 0781/203-0, Fax: 0781/203-1174
6.2

Chemical product settings

The correct settings for the quantity of detergent and rinse agent depend on the product
used.
The relevant chemical supplier can install the correct setting.
6.3

Works to be carried out before initial commissioning

All the points in this section must be observed before initial commissioning.
− water-carrying pipes
All pipes must be thoroughly flushed out. The heating system must not be
switched on when this is done (remove the fuses) in order to prevent the
heating elements from operating when the system is dry. All dirt collectors
must be cleaned afterwards.
− Steam pipes
All pipes must be thoroughly flushed out. When doing so, all control valves must be
fully open and all condensate traps removed. All dirt collectors must be cleaned
afterwards.
− Connection to the electricity supply.
• Tighten all electrical terminals in the switch cabinet; check that electrical
plugs/jacks are firmly in position.
• All motors must be check for the correct direction of rotation.
• Carry out a visual check on all electrical equipment (e.g. switches, cables,
housings, covers).
• Carry out functional tests on all electrical switches.
− Internal regions of the machine
Ensure that there are no foreign bodies inside the machine (e.g. cleaning rags, loose
bolts/washers/nuts, tools, packaging materials etc.).
Important !!!
Ensure that friction cannot occur where moving parts pass
close to fixed parts.
Ensure that all wash pipes, wash systems, rinse arms, screens and filters, tank covers,
waste pipes, waste screens and swing valves on the entry and discharge section are
installed. Ensure that all the parts are correctly installed.
7
Preparation – Operation - Washing with dish-washer
Once all installation work (electrical, water, waste water, hot steam, exhaust air) is
complete and all settings (wash tank, clear rinse water and drying temperatures, clean
rinse water quantity, monitoring times for the tank fillings, conveyor overload switch
activation) have been entered by trained specialists (see chapter 3) the machine can
be commissioned.
gültig ab: 2003-01
W e reserve the right to change execution and construction!
(e.g. rails, water deflectors and others).
Ident-Nr.: 9619165
Update: 2004-05-07
18/38

Hide quick links:

Advertisement

Chapters

loading