Exhaust Air Connection Of The Appliance; Machine Settings For Initial Commissioning By The Service Engineer; Commissioning - Meiko K-Tronic Service Manual

Basket transport dishwashing machine

Advertisement

Operating instructions dishwashing machine model K-Tronic
ATTENTION!
Datei:2K_9626212_Betriebsanleitung-MIKE_EN_2005-12-01.doc
MEIKO Maschinenbau GmbH & Co. KG, Postfach 2040, D-77652 Offenburg, Tel.: 0781/203-0, Fax: 0781/203-1174
All discharge pipes for water from the machine must be connected to the kitchen waste
water system via an adequately dimensioned odour trap.
When selecting materials for pipes, sealants etc, you must bear in mind that the
temperature of the water discharged from the machine can be 70 - 75° C.
Furthermore, the pH values can lie between 3 and 12 depending on the nature
and concentration of the detergent; in other words, the materials must be
resistant to both acids and alkalis. Connect waste pipes on site in accordance
with the instructions on the installation plan.

5.10 Exhaust air connection of the appliance

Air control equipment must be designed to comply with local regulations (for example, in
Germany VDI 2052) and must in all cases be water-tight and corrosion resistant.
The values indicated for exhaust air temperature and humidity can increase under certain
operating conditions (e.g. standby).
The discharge air connection must be connected into the building's exhaust air system as
in the installation plan.
Important !!!
The exhaust air connection must be made in such a way that the
parts containing water are not damaged in frosty weather.
If this is not possible, frost protection must be installed.
The hot, moist air from the machine must be removed from the washing-up kitchen. In
order to achieve efficient extraction, you must ensure that the overpressure on the
machine ducts or the negative pressure of the building is adequate.
6
Machine settings for initial commissioning by the
service engineer
6.1

Commissioning

In order to avoid damage to the installation and the injury and death of persons when
commissioning the installation, the following points must be observed without fail:
Any necessary initial tests to parts supplied by sub-suppliers, such as heat pumps or
other equipment, must be carried out. More detailed information, if required, can be found
in the relevant Instructions for Use.
The installation may only be commissioned by suitably qualified persons observing
the safety instructions.
Before initial startup, check that any tools and parts not belonging to the
installation have been removed.
Check whether any escaping liquid is removed.
Activate all the safety systems and door switches before commissioning.
Check that all screw connections are tight.
Please also read the chapter on "General safety instructions ".
Commissioning and instructions will be provided by technicians specially trained by
Meiko The operator may only use the installation after training has been provided.
gültig ab: 2003-01
W e reserve the right to change execution and construction!
Ident-Nr.: 9619165
Update: 2004-05-07